Home / Prevailing Wage / New York
New York Prevailing Wage Rates for Electricians
ElectricianDB Editorial · Last updated 2026-09-30
The prevailing wage for electricians in New York ranges from $1.80 to $127.81 per hour (base + fringe) as of 2026-09-30 per SAM.gov Davis-Bacon determinations and New York DOL.
At a glance
Commercial electrician prevailing wage in New York ranges from $26.92 to $127.81 per hour (base + fringe) as of 2026-08-13 per SAM.gov Davis-Bacon determinations. Residential and other construction types shown separately below.
$80.40/hr
Commercial (Building) median
$80.40/hr
Highway median
$80.40/hr
Heavy median
$74.08/hr
Residential median
48
Counties covered
98
Determinations
- Median electrician total
- $80.40/hour (base + fringe)
- Coverage
- 98 determinations · 1221 electrician rates
- Highest-rate counties
- Orange ($93.72) · Sullivan ($87.07) · Oswego ($80.40)
- Classifications covered
- CABLE SPLICER · CABLE SPLICER (ALABAMA, ALEXANDER, DARIEN, ELBA, OAKFIELD, PEMBROKE AND THAT PORTION OF BATAVIA AND ELBA WHICH ARE WEST OF LITTLE TONAWANDA CREEK, TONAWANDA CREEK, THE CITY OF BATAVIA (STATE AND HIGHW · CABLE SPLICER (ALLEGANY (TOWNSHIPS OF ALMA, BELFAST, BELMONT, BOLIVAR, CONEADEA, CENTERVILLE, CLARKSVILLE, CUBA, FRIENDSHIP, GENESEE, NEW HUDSON, RUSHFORD, SCIO AND WIRT CATTARAUGUS (REMAINDER OF COUN · CABLE SPLICER (BERKSHIRE, NEWARK VALLEY, OWEGO, RICHFORD AND TIOGA TOWNSHIPS) · CABLE SPLICER (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (ENTIRE COUNTY, EXCEPT COLUMBUS, NEW BERLIN AND SHERBURNE TOWNSHIPS) HEAVY AND HIGHWAY) · CABLE SPLICER (BUTTERNUT, HARTWICK, LAURENS, MARYLAND, MILFORD, MORRIS, ONEONTA, OTEGO, UNADILLA AND WESTFORD TOWNSHIPS) +126 more
Electrician rates by county — NY
Every row is an electrician classification from an ingested Davis-Bacon determination. Click a column to sort; filter by county or trade for large states. Always confirm against the linked source document before bidding.
Showing 100 of 1219 electrician rates
| Effective | Source | ||||||
|---|---|---|---|---|---|---|---|
| Statewide | ELECTRICIAN PAID HOLIDAYS: A. NEW YEARS DAY, MARTIN LUTHER KING, JR.'S BIRTHDAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, ELECTION DAY, THANKSGIVING DAY, THE DAYNY20260003 | Building+Heavy+Highway+Residential | $62.00 | $65.81 | $127.81 | 2026-08-13 | Doc → |
| Statewide | LABORERS: FREE AIR & TUNNEL MAINTENANCE MEN, INSIDE MUCK LOCK TENDERS, PUMP MEN, ELECTRICIANS, CEMENT FINISHERS, CAULKERS, HYDRAULIC MEN, SHIELD MEN, MONORAIL OPERATORS, MOTOR MEN, CONVEYOR MEN, POWDENY20260003 | Building+Heavy+Highway+Residential | $64.08 | $54.00 | $118.08 | 2026-08-13 | Doc → |
| Statewide | ELECTRICIANNY20260012 | Building+Heavy+Highway+Residential | $64.55 | $47.40 | $111.95 | 2026-05-18 | Doc → |
| Statewide | LINE CONSTRUCTION, SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/TRANSMISSION SYSTEMS MAINTENANCE (WHEN WORK IS NONY20260003 | Building+Heavy+Highway+Residential | $70.57 | $39.19 | $109.76 | 2026-08-13 | Doc → |
| Statewide | LINE CONSTRUCTION: LINEMAN & CABLE SPLICER (SUBSTATION AND SWITCHING STRUCTURES PIPE TYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS; RAILROAD ELECTRICAL DISTRIBUTION/ TRANSMISSION SYSTEMS MANY20260012 | Building+Heavy+Highway+Residential | $70.57 | $39.19 | $109.76 | 2026-05-18 | Doc → |
| Oswego | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260038 | Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-07-30 | Doc → |
| Cayuga | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260036 | Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-07-30 | Doc → |
| Delaware | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260021 | Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-07-30 | Doc → |
| Genesee | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260029 | Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-07-30 | Doc → |
| Niagara | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260011 | Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-07-30 | Doc → |
| Oneida | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260014 | Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-07-30 | Doc → |
| Madison | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260015 | Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-07-30 | Doc → |
| Franklin | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260035 | Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-07-30 | Doc → |
| Otsego | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260037 | Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-07-30 | Doc → |
| Wayne | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260044 | Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-07-30 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260006 | Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-07-30 | Doc → |
| Hamilton | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260046 | Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-07-30 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260008 | Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-07-30 | Doc → |
| Onondaga | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260016 | Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-07-30 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260009 | Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-07-30 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260005 | Building+Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Wyoming | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260041 | Highway | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Warren | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260039 | Building+Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260004 | Building+Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260002 | Building+Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Rockland | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260020 | Building+Heavy+Highway+Residential | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260048 | Heavy | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Monroe | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260010 | Building+Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Tompkins | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260024 | Highway | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Putnam | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260025 | Building+Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Ontario | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260032 | Building+Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Herkimer | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260031 | Building+Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Yates | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260033 | Highway | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Livingston | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260030 | Building+Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Orleans | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260034 | Building+Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Seneca | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260040 | Highway | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Cortland | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260042 | Highway | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Tioga | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260045 | Building+Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Allegany | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260047 | Highway | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Erie | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260050 | Building | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable instNY20260007 | Building+Heavy+Highway | $64.59 | $42.92 | $107.51 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)NY20260004 | Building+Heavy+Highway | $63.14 | $42.82 | $105.96 | 2026-05-18 | Doc → |
| Oswego | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260038 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Oswego | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260038 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Oswego | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260038 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Cayuga | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260036 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Cayuga | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260036 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Cayuga | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260036 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Delaware | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260021 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Delaware | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260021 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Delaware | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260021 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Genesee | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260029 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Genesee | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260029 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Genesee | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260029 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Niagara | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260011 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Niagara | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260011 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Niagara | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260011 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Oneida | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260014 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Oneida | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260014 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Oneida | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260014 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Madison | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260015 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Madison | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260015 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Madison | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260015 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Franklin | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260035 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Franklin | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260035 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Franklin | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260035 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Otsego | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260037 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Otsego | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260037 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Otsego | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260037 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Wayne | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260044 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Wayne | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260044 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Wayne | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260044 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Statewide | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260006 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260006 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260006 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Hamilton | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260046 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Hamilton | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260046 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Hamilton | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260046 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Statewide | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260008 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260008 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260008 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Onondaga | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260016 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Onondaga | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260016 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Onondaga | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260016 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Statewide | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260009 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260009 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260009 | Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-07-30 | Doc → |
| Statewide | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260005 | Building+Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260005 | Building+Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260005 | Building+Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-05-18 | Doc → |
| Wyoming | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260041 | Highway | $61.56 | $36.21 | $97.77 | 2026-05-18 | Doc → |
| Wyoming | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260041 | Highway | $61.56 | $36.21 | $97.77 | 2026-05-18 | Doc → |
| Wyoming | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260041 | Highway | $61.56 | $36.21 | $97.77 | 2026-05-18 | Doc → |
| Warren | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260039 | Building+Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-05-18 | Doc → |
| Warren | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260039 | Building+Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-05-18 | Doc → |
| Warren | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260039 | Building+Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260004 | Building+Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)NY20260004 | Building+Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduitNY20260004 | Building+Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPNY20260002 | Building+Heavy+Highway | $61.56 | $36.21 | $97.77 | 2026-05-18 | Doc → |
Wage determinations — NY
| Determination | Coverage | Electrician total | Effective | Source |
|---|---|---|---|---|
| NY20260003Building, Heavy, Highway, Residential | 5 counties | $59.16–$127.81 | 2026-08-13 | Document → |
| NY20260038Heavy, Highway | Oswego Co. (36075) | $26.92–$107.51 | 2026-07-30 | Document → |
| NY20260036Heavy, Highway | Cayuga Co. (36011) | $26.92–$107.51 | 2026-07-30 | Document → |
| NY20260021Heavy, Highway | Delaware Co. (36025) | $26.92–$107.51 | 2026-07-30 | Document → |
| NY20260029Heavy, Highway | Genesee Co. (36037) | $26.92–$107.51 | 2026-07-30 | Document → |
| NY20260011Heavy, Highway | Niagara Co. (36063) | $26.92–$107.51 | 2026-07-30 | Document → |
| NY20260014Heavy, Highway | Oneida Co. (36065) | $26.92–$107.51 | 2026-07-30 | Document → |
| NY20260015Heavy, Highway | Madison Co. (36053) | $26.92–$107.51 | 2026-07-30 | Document → |
| NY20260035Heavy, Highway | Franklin Co. (36033) | $26.92–$107.51 | 2026-07-30 | Document → |
| NY20260037Heavy, Highway | Otsego Co. (36077) | $26.92–$107.51 | 2026-07-30 | Document → |
| NY20260044Heavy, Highway | Wayne Co. (36117) | $26.92–$107.51 | 2026-07-30 | Document → |
| NY20260006Heavy, Highway | Clinton, Essex | $26.92–$107.51 | 2026-07-30 | Document → |
| NY20260046Heavy, Highway | Hamilton Co. (36041) | $26.92–$107.51 | 2026-07-30 | Document → |
| NY20260008Heavy, Highway | Cattaraugus, Chautauqua, Erie | $26.92–$107.51 | 2026-07-30 | Document → |
| NY20260016Heavy, Highway | Onondaga Co. (36067) | $26.92–$107.51 | 2026-07-30 | Document → |
| NY20260009Heavy, Highway | Jefferson, Lewis, St Lawrence | $26.92–$107.51 | 2026-07-30 | Document → |
| NY20260105Building | Columbia Co. (36021) | $60.66 | 2026-05-18 | Document → |
| NY20260092Residential | Schenectady Co. (36093) | $35.48 | 2026-05-18 | Document → |
| NY20260005Building, Heavy, Highway | Schuyler, Chemung | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260104Building | Clinton Co. (36019) | $71.88 | 2026-05-18 | Document → |
| NY20260041Highway | Wyoming Co. (36121) | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260039Building, Heavy, Highway | Warren Co. (36113) | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260004Building, Heavy, Highway | Broome, Chenango | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260077Residential | 6 counties | $17.08 | 2026-05-18 | Document → |
| NY20260090Residential | Oswego Co. (36075) | $22.18 | 2026-05-18 | Document → |
| NY20260002Building, Heavy, Highway | 10 counties | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260103Building | Chenango Co. (36017) | $60.66 | 2026-05-18 | Document → |
| NY20260106Building | Cortland Co. (36023) | $58.39 | 2026-05-18 | Document → |
| NY20260117Building | Steuben Co. (36101) | $69.73 | 2026-05-18 | Document → |
| NY20260094Residential | Putnam, Dutchess, Ulster | $35.48 | 2026-05-18 | Document → |
| NY20260020Building, Heavy, Highway, Residential | Rockland Co. (36087) | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260074Residential | Allegany Co. (36003) | $17.08 | 2026-05-18 | Document → |
| NY20260093Residential | 4 counties | $39.00 | 2026-05-18 | Document → |
| NY20260048Heavy | 9 counties | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260010Building, Heavy, Highway | Monroe Co. (36055) | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260101Building | Cayuga Co. (36011) | $76.12 | 2026-05-18 | Document → |
| NY20260100Building | Cattaraugus Co. (36009) | $69.73 | 2026-05-18 | Document → |
| NY20260022Building | Jefferson Co. (36045) | $71.88 | 2026-05-18 | Document → |
| NY20260075Residential | Chautauqua Co. (36013) | $17.08 | 2026-05-18 | Document → |
| NY20260096Residential | Livingston, Wayne, Yates | $27.81 | 2026-05-18 | Document → |
| NY20260001Heavy | 62 counties | $1.80 | 2026-05-18 | Document → |
| NY20260102Building | Chautauqua Co. (36013) | $69.73 | 2026-05-18 | Document → |
| NY20260110Building | Genesee Co. (36037) | $69.73 | 2026-05-18 | Document → |
| NY20260108Building | Essex Co. (36031) | $71.88 | 2026-05-18 | Document → |
| NY20260109Building | Fulton Co. (36035) | $71.88 | 2026-05-18 | Document → |
| NY20260107Building | Delaware Co. (36025) | $75.74 | 2026-05-18 | Document → |
| NY20260111Building | Greene Co. (36039) | $60.66 | 2026-05-18 | Document → |
| NY20260113Building | Otsego Co. (36077) | $75.74 | 2026-05-18 | Document → |
| NY20260112Building | Lewis Co. (36049) | $71.88 | 2026-05-18 | Document → |
| NY20260114Building | Schuyler Co. (36097) | $69.73 | 2026-05-18 | Document → |
| NY20260115Building | Seneca Co. (36099) | $76.12 | 2026-05-18 | Document → |
| NY20260116Building | St Lawrence | $71.88 | 2026-05-18 | Document → |
| NY20260119Building | Wyoming Co. (36121) | $69.73 | 2026-05-18 | Document → |
| NY20260012Building, Heavy, Highway, Residential | Nassau, Suffolk | $72.39–$111.95 | 2026-05-18 | Document → |
| NY20260118Building | Sullivan Co. (36105) | $87.07 | 2026-05-18 | Document → |
| NY20260120Building | Montgomery, Franklin, Hamilton | $71.88 | 2026-05-18 | Document → |
| NY20260013Building | Oneida Co. (36065) | $85.53–$90.58 | 2026-05-18 | Document → |
| NY20260018Highway | Steuben Co. (36101) | $61.59–$88.46 | 2026-05-18 | Document → |
| NY20260017Building, Heavy, Highway, Residential | Westchester Co. (36119) | $2.00–$94.48 | 2026-05-18 | Document → |
| NY20260019Building | Niagara Co. (36063) | $77.10 | 2026-05-18 | Document → |
| NY20260023Building | Madison Co. (36053) | $50.02 | 2026-05-18 | Document → |
| NY20260024Highway | Tompkins Co. (36109) | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260025Building, Heavy, Highway | Putnam Co. (36079) | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260026Building | Onondaga Co. (36067) | $85.53 | 2026-05-18 | Document → |
| NY20260027Building | Oswego Co. (36075) | $85.53 | 2026-05-18 | Document → |
| NY20260032Building, Heavy, Highway | Ontario Co. (36069) | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260031Building, Heavy, Highway | Herkimer Co. (36043) | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260033Highway | Yates Co. (36123) | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260030Building, Heavy, Highway | Livingston Co. (36051) | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260034Building, Heavy, Highway | Orleans Co. (36073) | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260040Highway | Seneca Co. (36099) | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260043Building | Wayne Co. (36117) | $74.50–$85.53 | 2026-05-18 | Document → |
| NY20260042Highway | Cortland Co. (36023) | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260049Residential | Orange Co. (36071) | $93.72 | 2026-05-18 | Document → |
| NY20260045Building, Heavy, Highway | Tioga Co. (36107) | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260047Highway | Allegany Co. (36003) | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260050Building | Erie Co. (36029) | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260051Building | Tompkins Co. (36109) | $76.39–$90.58 | 2026-05-18 | Document → |
| NY20260073Building | Yates Co. (36123) | $76.12 | 2026-05-18 | Document → |
| NY20260007Building, Heavy, Highway | 4 counties | $26.92–$107.51 | 2026-05-18 | Document → |
| NY20260076Residential | Essex Co. (36031) | $71.88 | 2026-05-18 | Document → |
| NY20260079Residential | 7 counties | $71.88 | 2026-05-18 | Document → |
| NY20260078Residential | 6 counties | $71.88 | 2026-05-18 | Document → |
| NY20260080Residential | Columbia, Greene | $71.88 | 2026-05-18 | Document → |
| NY20260081Residential | Albany Co. (36001) | $35.48 | 2026-05-18 | Document → |
| NY20260083Residential | Jefferson Co. (36045) | $46.54 | 2026-05-18 | Document → |
| NY20260082Residential | Erie Co. (36029) | $25.34 | 2026-05-18 | Document → |
| NY20260084Residential | Madison Co. (36053) | $46.54 | 2026-05-18 | Document → |
| NY20260085Residential | Monroe Co. (36055) | $27.82 | 2026-05-18 | Document → |
| NY20260086Residential | Niagara Co. (36063) | $27.56 | 2026-05-18 | Document → |
| NY20260087Residential | Onondaga Co. (36067) | $46.54 | 2026-05-18 | Document → |
| NY20260088Residential | Ontario Co. (36069) | $27.81 | 2026-05-18 | Document → |
| NY20260089Residential | Orleans Co. (36073) | $27.81 | 2026-05-18 | Document → |
| NY20260091Residential | Saratoga Co. (36091) | $35.48 | 2026-05-18 | Document → |
| NY20260097Residential | Rensselaer, Schoharie | $35.48 | 2026-05-18 | Document → |
| NY20260095Residential | Oneida, Herkimer | $22.59 | 2026-05-18 | Document → |
| NY20260098Residential | Warren, Washington | $35.48 | 2026-05-18 | Document → |
| NY20260099Building | Allegany Co. (36003) | $69.73 | 2026-05-18 | Document → |
How prevailing wage works in New York
Electricians on federally funded construction in New York must be paid at least the Davis-Bacon prevailing wage for their classification and county. The U.S. Department of Labor publishes these rates as general wage determinations on SAM.gov, and federal contracting agencies incorporate the applicable determination into each covered contract. This page tracks 98 determinations covering New York.
On state-funded public works, New York DOL publishes its own prevailing-wage schedules, which can differ from the federal rates in classifications, area definitions, and overtime treatment. When a project triggers both federal and state requirements, contractors owe the higher rate for each hour in each classification. Verify the controlling schedule with New York DOL before bidding.
Use the determination table below as your starting point: match your project's county and construction type, then open the source document to confirm the classification definitions, footnotes, and any-Series modifications. Published rates are minimums — union agreements and tight labor markets routinely clear them — and misclassification (billing journeyman hours at a laborer rate) is one of the most common prevailing-wage violations.
Display note: we exclude rates below $12/hr base from this page. These are typically rural residential determinations at or near federal minimum wage, data-entry artifacts, or structurally non-journeyman classifications that misrepresent prevailing wage for commercial electrical work. The full dataset remains available via SAM.gov directly.
Sources
Related guides
New York license reciprocity
Licensed in New York? See which states honor it.
Electrician pay in New York
Market rates from live postings vs BLS vs IBEW scale.
New York data center builds
Federal projects pay these rates — see where they are.
IBEW locals in New York
Union halls, apprenticeship programs, and scales.
Data center electrician jobs guide
How to land prevailing-wage work on hyperscale builds.
Certifications that raise pay
NICET, NABCEP, OSHA-30 and more — what they cost and return.
New York prevailing wage FAQs
What is the prevailing wage for electricians in New York?
Across the 1221 electrician rates currently tracked, totals (base + fringe) range from $1.80 to $127.81 per hour, with a median of $80.40. Your project's county and construction type determine which row applies.
How is the electrician prevailing wage set in New York?
Federal Davis-Bacon rates come from Department of Labor surveys of locally prevailing union and open-shop packages, published as SAM.gov wage determinations per county group and construction type. State-funded work additionally follows New York DOL schedules.
Do apprentice electricians earn the full journeyman rate?
Registered apprentices in approved programs are typically paid a progression percentage of the journeyman base rate, while fringe treatment varies by determination and program. Unregistered workers generally must receive the full journeyman package. Confirm the apprentice terms in the determination footnotes and your program agreement.
Why are rates below $12/hr excluded?
We exclude rates below $12/hr base from display. These are typically rural residential determinations at or near federal minimum wage, data-entry artifacts, or structurally non-journeyman classifications that misrepresent prevailing wage for commercial electrical work. The full dataset remains available via SAM.gov directly, and our database retains every ingested row for audit.
Where can I verify the official New York rates?
Start with the source-document links in the determination table — federal rows link to SAM.gov, state rows to the publishing agency. For binding answers on coverage, classification, and conformance, contact the DOL Wage and Hour Division or New York DOL.