Home / Prevailing Wage / Missouri
Missouri Prevailing Wage Rates for Electricians
ElectricianDB Editorial · Last updated 2026-09-30
The prevailing wage for electricians in Missouri ranges from $15.53 to $105.02 per hour (base + fringe) as of 2026-09-30 per SAM.gov Davis-Bacon determinations.
At a glance
Commercial electrician prevailing wage in Missouri ranges from $29.65 to $82.93 per hour (base + fringe) as of 2026-09-03 per SAM.gov Davis-Bacon determinations. Residential and other construction types shown separately below.
$64.70/hr
Commercial (Building) median
$62.75/hr
Heavy median
$62.75/hr
Highway median
$28.14/hr
Residential median
36
Counties covered
65
Determinations
- Median electrician total
- $63.76/hour (base + fringe)
- Coverage
- 65 determinations · 106 electrician rates
- Highest-rate counties
- Dunklin ($82.93) · Mississippi ($82.93) · New Madrid ($82.93)
- Classifications covered
- ELECTRICIAN · ELECTRICIAN (ADAIR COUNTY) · ELECTRICIAN (BATES, CALDWELL, CASS, CLAY, CLINTON, LAFAYETTE, PLATTE & RAY COUNTIES) · ELECTRICIAN (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST. FRANCOIS, STE. GENEVIEVE, & WAYNE COUNTIES) · ELECTRICIAN (CLARK, KNOX, LEWIS, LINN, MACON, MARION, MONROE, PIKE, PUTNAM, SCHUYLER, SCOTLAND, SHELBY, & SULLIVAN COUNTIES) · ELECTRICIAN (COMMUNICATION TECHNICIAN) +42 more
Electrician rates by county — MO
Every row is an electrician classification from an ingested Davis-Bacon determination. Click a column to sort; filter by county or trade for large states. Always confirm against the linked source document before bidding.
Showing 100 of 106 electrician rates
| Effective | Source | ||||||
|---|---|---|---|---|---|---|---|
| Statewide | LINE CONSTRUCTION: LINEMAN (BOLLINGER, BUTLER, CAPE GIRARDEAU, DUNKLIN, MADISON, MISSISSIPPI, NEW MADRID, PEMISCOT, SCOTT, STODDARD AND WAYNE COUNTIES)MO20260001 | Heavy+Highway | $74.55 | $30.47 | $105.02 | 2026-08-27 | Doc → |
| Statewide | LINE CONSTRUCTION: LINEMAN & CABLE SPLICER (ADAIR, AUDRAIN, BOONE, CALLAWAY, CAMDEN, CARTER, CHARITON, CLARK, COLE, COOPER, CRAWFORD, DENT, FRANKLIN, GASCONADE, HOWARD, HOWELL, IRON, JEFFERSON, KNOX, MO20260001 | Heavy+Highway | $57.88 | $28.63 | $86.51 | 2026-08-27 | Doc → |
| Statewide | LINE CONSTRUCTION: LINEMAN (ANDREW, ATCHINSON, BARRY, BARTON, BATES, BENTON, BUCHANAN, CALDWELL, CARROLL, CASS, CEDAR, CHRISTIAN, CLAY, CLINTON, DADE, DALLAS, DAVIES, DEKALB, DOUGLAS, GENTRY, GREENE, MO20260001 | Heavy+Highway | $58.15 | $27.56 | $85.71 | 2026-08-27 | Doc → |
| St Louis City | ELECTRICIANMO20260080 | Building | $49.29 | $33.64 | $82.93 | 2026-09-03 | Doc → |
| Statewide | ELECTRICIANS (BOLLINGER, BUTLER, CAPE GIRARDEAU, CARTER, DUNKLIN, FRANKLIN, IRON, JEFFERSON, LINCOLN, MADISON, MISSISSIPPI, NEW MADRID, PEMISCOT, PERRY,REYNOLDS, RIPLEY, ST. CHARLES, ST. FRANCOIS, ST.MO20260001 | Heavy+Highway | $49.29 | $33.64 | $82.93 | 2026-08-27 | Doc → |
| Statewide | ELECTRICIAN (CARTER, IRON, MADISON, PERRY, REYNOLDS, ST. FRANCOIS, STE. GENEVIEVE, & WAYNE COUNTIES)MO20260030 | Building | $49.29 | $33.64 | $82.93 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANMO20260087 | Building | $49.29 | $33.64 | $82.93 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN (COMMUNICATION TECHNICIAN)MO20260087 | Building | $49.29 | $33.64 | $82.93 | 2026-05-18 | Doc → |
| Dunklin | ELECTRICIANMO20260011 | Building | $49.29 | $33.64 | $82.93 | 2026-05-18 | Doc → |
| Mississippi | ELECTRICIANMO20260014 | Building | $49.29 | $33.64 | $82.93 | 2026-05-18 | Doc → |
| New Madrid | ELECTRICIANMO20260015 | Building | $49.29 | $33.64 | $82.93 | 2026-05-18 | Doc → |
| Pemiscot | ELECTRICIANMO20260016 | Building | $49.29 | $33.64 | $82.93 | 2026-05-18 | Doc → |
| Ripley | ELECTRICIANMO20260021 | Building | $49.29 | $33.64 | $82.93 | 2026-05-18 | Doc → |
| Scott | ELECTRICIANMO20260022 | Building | $49.29 | $33.64 | $82.93 | 2026-05-18 | Doc → |
| Stoddard | ELECTRICIANMO20260024 | Building | $49.29 | $33.64 | $82.93 | 2026-05-18 | Doc → |
| Butler | ELECTRICIANMO20260004 | Building | $49.29 | $33.64 | $82.93 | 2026-05-18 | Doc → |
| Franklin | ELECTRICIANMO20260074 | Building | $49.29 | $33.64 | $82.93 | 2026-05-18 | Doc → |
| Franklin | ELECTRICIAN (COMMUNICATION TECHNICIAN)MO20260074 | Building | $49.29 | $33.64 | $82.93 | 2026-05-18 | Doc → |
| Jefferson | ELECTRICIANMO20260077 | Building | $49.29 | $33.64 | $82.93 | 2026-05-18 | Doc → |
| Jefferson | ELECTRICIAN (COMMUNICATION TECHNICIAN)MO20260077 | Building | $49.29 | $33.64 | $82.93 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANMO20260089 | Building | $49.29 | $33.64 | $82.93 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN (COMMUNICATION TECHNICIAN)MO20260089 | Building | $49.29 | $33.64 | $82.93 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANMO20260083 | Building | $49.29 | $33.64 | $82.93 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANS (BATES, BENTON, CARROLL, CASS, CLAY, COOPER, HENRY, JACKSON, JOHNSON, LAFAYETTE, MORGAN, PETTIS, PLATTE, RAY AND SALINE COUNTIES:)MO20260001 | Heavy+Highway | $54.01 | $27.85 | $81.86 | 2026-08-27 | Doc → |
| Statewide | ELECTRICIAN (SALINE COUNTY)MO20260031 | Building | $54.01 | $27.85 | $81.86 | 2026-05-18 | Doc → |
| Cooper | ELECTRICIANMO20260010 | Building | $54.01 | $27.85 | $81.86 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN (MORGAN COUNTY)MO20260033 | Building | $54.01 | $27.85 | $81.86 | 2026-05-18 | Doc → |
| Carroll | ELECTRICIANMO20260007 | Building | $54.01 | $27.85 | $81.86 | 2026-05-18 | Doc → |
| Cass | ELECTRICIANMO20260072 | Building | $54.01 | $27.85 | $81.86 | 2026-05-18 | Doc → |
| Clinton | ELECTRICIANMO20260073 | Building | $54.01 | $27.85 | $81.86 | 2026-05-18 | Doc → |
| Platte | ELECTRICIANMO20260079 | Building | $54.01 | $27.85 | $81.86 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANMO20260082 | Building | $54.01 | $27.85 | $81.86 | 2026-05-18 | Doc → |
| Johnson | ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS)MO20260012 | Building | $51.01 | $26.25 | $77.26 | 2026-05-18 | Doc → |
| Pettis | ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS)MO20260017 | Building | $51.01 | $26.25 | $77.26 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS (BENTON COUNTY)MO20260029 | Building | $51.01 | $26.25 | $77.26 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS (HENRY COUNTY)MO20260032 | Building | $51.01 | $26.25 | $77.26 | 2026-05-18 | Doc → |
| Statewide | LINE CONSTRUCTION: HEAVY-EQUIPMENT OPERATOR CLASS I (ALL CRAWLER TYPE EQUIPMENT D-4 AND LARGER) (BOLLINGER, BUTLER, CAPE GIRARDEAU, DUNKLIN, MADISON, MISSISSIPPI, NEW MADRID, PEMISCOT, SCOTT, STODDARDMO20260001 | Heavy+Highway | $52.13 | $23.97 | $76.10 | 2026-08-27 | Doc → |
| Statewide | LINE CONSTRUCTION: EQUIPMENT OPERATOR (ADAIR, AUDRAIN, BOONE, CALLAWAY, CAMDEN, CARTER, CHARITON, CLARK, COLE, COOPER, CRAWFORD, DENT, FRANKLIN, GASCONADE, HOWARD, HOWELL, IRON, JEFFERSON, KNOX, LEWISMO20260001 | Heavy+Highway | $49.68 | $25.63 | $75.31 | 2026-08-27 | Doc → |
| Clinton | ELECTRICIAN (COMMUNICATION TECHNICIAN)MO20260073 | Building | $48.23 | $25.35 | $73.58 | 2026-05-18 | Doc → |
| Platte | ELECTRICIAN (COMMUNICATION TECHNICIAN)MO20260079 | Building | $48.23 | $25.35 | $73.58 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN (COMMUNICATION TECHNICIAN)MO20260082 | Building | $48.23 | $25.35 | $73.58 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN (BATES, CALDWELL, CASS, CLAY, CLINTON, LAFAYETTE, PLATTE & RAY COUNTIES)MO20260066 | Residential | $47.37 | $25.89 | $73.26 | 2026-05-18 | Doc → |
| Statewide | LINE CONSTRUCTION: LINEMAN OPERATOR (ANDREW, ATCHINSON, BARRY, BARTON, BATES, BENTON, BUCHANAN, CALDWELL, CARROLL, CASS, CEDAR, CHRISTIAN, CLAY, CLINTON, DADE, DALLAS, DAVIES, DEKALB, DOUGLAS, GENTRY,MO20260001 | Heavy+Highway | $52.45 | $20.13 | $72.58 | 2026-08-27 | Doc → |
| Statewide | LINE CONSTRUCTION: GROUNDMAN-EQUIPMENT OPERATOR CLASS II (ALL OTHER EQUIPMENT) (BOLLINGER, BUTLER, CAPE GIRARDEAU, DUNKLIN, MADISON, MISSISSIPPI, NEW MADRID, PEMISCOT, SCOTT, STODDARD AND WAYNE COUNTIMO20260001 | Heavy+Highway | $46.49 | $22.33 | $68.82 | 2026-08-27 | Doc → |
| Jackson | ELECTRICIANMO20260063 | Residential | $42.61 | $23.31 | $65.92 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANS (ANDREW, BUCHANAN, CLINTON, DEKALB, ATCHISON, HOLT, MERCER, GENTRY, HARRISON, DAVIESS, GRUNDY, WORTH, LIVINGSTON, NODAWAY, AND CALDWELL COUNTIES)MO20260001 | Heavy+Highway | $43.20 | $21.50 | $64.70 | 2026-08-27 | Doc → |
| Statewide | ELECTRICIAN (DAVIESS, GENTRY, GRUNDY, HARRISON, HOLT, LIVINGSTON, MERCER, NODAWAY, & WORTH COUNTIES)MO20260031 | Building | $43.20 | $21.50 | $64.70 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANMO20260028 | Building | $43.20 | $21.50 | $64.70 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANMO20260081 | Building | $43.20 | $21.50 | $64.70 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANS: ELECTRICIANS (AUDRAIN (EXCEPT CUIVRE TOWNSHIP), BOONE, CALLAWAY, CAMDEN, CHARITON, COLE, CRAWFORD, DENT, GASCONADE, HOWARD, MARIES, MILLER, MONITEAU, OSAGE, PHELPS AND RANDOLPH COUNTIES)MO20260001 | Heavy+Highway | $40.50 | $23.26 | $63.76 | 2026-08-27 | Doc → |
| Statewide | ELECTRICIAN (RANDOLPH COUNTY)MO20260031 | Building | $40.50 | $23.26 | $63.76 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANMO20260085 | Building | $40.50 | $23.26 | $63.76 | 2026-05-18 | Doc → |
| Crawford | ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING INSTALLER; ALARM, COMPUTER & TELEPHONE INSTALLATION)MO20260056 | Building | $40.50 | $23.26 | $63.76 | 2026-05-18 | Doc → |
| Phelps | ELECTRICIANMO20260018 | Building | $40.50 | $23.26 | $63.76 | 2026-05-18 | Doc → |
| Audrain | ELECTRICIAN (WEST OF HIGHWAY 19)MO20260002 | Building | $40.50 | $23.26 | $63.76 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANMO20260084 | Building | $40.50 | $23.26 | $63.76 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN (DENT, GASCONADE, MARIES, & MILLER COUNTIES)MO20260033 | Building | $40.50 | $23.26 | $63.76 | 2026-05-18 | Doc → |
| Moniteau | ELECTRICIANMO20260078 | Building | $40.50 | $23.26 | $63.76 | 2026-05-18 | Doc → |
| Chariton | ELECTRICIANMO20260009 | Building | $40.50 | $23.26 | $63.76 | 2026-05-18 | Doc → |
| Statewide | LINE CONSTRUCTION: GROUNDMAN (ANDREW, ATCHINSON, BARRY, BARTON, BATES, BENTON, BUCHANAN, CALDWELL, CARROLL, CASS, CEDAR, CHRISTIAN, CLAY, CLINTON, DADE, DALLAS, DAVIES, DEKALB, DOUGLAS, GENTRY, GREENEMO20260001 | Heavy+Highway | $35.86 | $25.88 | $61.74 | 2026-08-27 | Doc → |
| Statewide | ELECTRICIANS (ADAIR, AUDRAIN (EAST OF HIGHWAY 19), CLARK, KNOX, LEWIS, LINN, MACON, MARION, MONROE, MONTGOMERY, PIKE, PUTNAM, RALLS, SCHUYLER, SCOTLAND, SHELBY AND SULLIVAN COUNTIES)MO20260001 | Heavy+Highway | $37.60 | $22.14 | $59.74 | 2026-08-27 | Doc → |
| Statewide | ELECTRICIAN (CLARK, KNOX, LEWIS, LINN, MACON, MARION, MONROE, PIKE, PUTNAM, SCHUYLER, SCOTLAND, SHELBY, & SULLIVAN COUNTIES)MO20260031 | Building | $37.60 | $22.14 | $59.74 | 2026-05-18 | Doc → |
| Ralls | ELECTRICIANMO20260020 | Building | $37.60 | $22.14 | $59.74 | 2026-05-18 | Doc → |
| Audrain | ELECTRICIAN (EAST OF HIGHWAY 19)MO20260002 | Building | $37.60 | $22.14 | $59.74 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN (ADAIR COUNTY)MO20260028 | Building | $37.60 | $22.14 | $59.74 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN (MONTGOMERY COUNTY)MO20260033 | Building | $37.60 | $22.14 | $59.74 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANS (PULASKI AND TEXAS COUNTIES)MO20260001 | Heavy+Highway | $39.70 | $19.84 | $59.54 | 2026-08-27 | Doc → |
| Pulaski | ELECTRICIANMO20260019 | Building | $39.70 | $19.84 | $59.54 | 2026-05-18 | Doc → |
| Texas | ELECTRICIANMO20260025 | Building | $39.70 | $19.84 | $59.54 | 2026-05-18 | Doc → |
| Statewide | LINE CONSTRUCTION: GROUNDMAN & TRUCK DRIVER (ADAIR, AUDRAIN, BOONE, CALLAWAY, CAMDEN, CARTER, CHARITON, CLARK, COLE, COOPER, CRAWFORD, DENT, FRANKLIN, GASCONADE, HOWARD, HOWELL, IRON, JEFFERSON, KNOX,MO20260001 | Heavy+Highway | $37.95 | $21.35 | $59.30 | 2026-08-27 | Doc → |
| Statewide | LINE CONSTRUCTION: GROUNDMAN POWDERMAN (ANDREW, ATCHINSON, BARRY, BARTON, BATES, BENTON, BUCHANAN, CALDWELL, CARROLL, CASS, CEDAR, CHRISTIAN, CLAY, CLINTON, DADE, DALLAS, DAVIES, DEKALB, DOUGLAS, GENTMO20260001 | Heavy+Highway | $38.44 | $20.76 | $59.20 | 2026-08-27 | Doc → |
| Statewide | LINE CONSTRUCTION: GROUNDMAN - CLASS A (BOLLINGER, BUTLER, CAPE GIRARDEAU, DUNKLIN, MADISON, MISSISSIPPI, NEW MADRID, PEMISCOT, SCOTT, STODDARD AND WAYNE COUNTIES)MO20260001 | Heavy+Highway | $38.18 | $19.92 | $58.10 | 2026-08-27 | Doc → |
| Statewide | ELECTRICIAN (REMAINDER OF COUNTIES)MO20260070 | Residential | $44.36 | $11.53 | $55.89 | 2026-05-18 | Doc → |
| Franklin | ELECTRICIANMO20260062 | Residential | $44.36 | $11.53 | $55.89 | 2026-05-18 | Doc → |
| St Louis City | ELECTRICIANMO20260064 | Residential | $44.36 | $11.53 | $55.89 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANS: ELECTRICIANS (BARRY, BARTON, CEDAR, DADE, JASPER, LAWRENCE, MCDONALD, NEWTON, ST CLAIR, AND VERNON COUNTIES)MO20260001 | Heavy+Highway | $32.25 | $20.81 | $53.06 | 2026-08-27 | Doc → |
| Lawrence | ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS)MO20260013 | Building | $32.25 | $20.81 | $53.06 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANMO20260088 | Building | $32.25 | $20.81 | $53.06 | 2026-05-18 | Doc → |
| Vernon | ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS)MO20260026 | Building | $32.25 | $20.81 | $53.06 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS (BARRY & BARTON COUNTIES)MO20260029 | Building | $32.25 | $20.81 | $53.06 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS (DADE & ST. CLAIR COUNTIES)MO20260032 | Building | $32.25 | $20.81 | $53.06 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANMO20260071 | Residential | $32.25 | $20.81 | $53.06 | 2026-05-18 | Doc → |
| Jasper | ELECTRICIANMO20260076 | Building | $32.25 | $20.81 | $53.06 | 2026-05-18 | Doc → |
| Greene | ELECTRICIANMO20260075 | Building | $32.25 | $20.81 | $53.06 | 2026-05-18 | Doc → |
| Cedar | ELECTRICIAN (LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS ONLY)MO20260008 | Building | $32.25 | $20.81 | $53.06 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANMO20260086 | Building | $32.25 | $20.81 | $53.06 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANS (CHRISITAN, DALLAS, DOUGLAS, GREENE, HICKORY, HOWELL, LACLEDE, OREGON, OZARK, POLK, SHANNON, WEBSTER, AND WRIGHT COUNTIES)MO20260001 | Heavy+Highway | $32.40 | $19.11 | $51.51 | 2026-08-27 | Doc → |
| Shannon | ELECTRICIANMO20260023 | Building | $32.40 | $19.11 | $51.51 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN (HOWELL & OREGON COUNTIES)MO20260030 | Building | $32.40 | $19.11 | $51.51 | 2026-05-18 | Doc → |
| Wright | ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS)MO20260027 | Building | $32.40 | $19.11 | $51.51 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS: DOUGLAS, HICKORY, LACLEDE, & OZARK COUNTIES (DOUGLAS, HICKORY, LACLEDE, OZARK, STONE, & TANEY COUNTIES)MO20260032 | Building | $32.40 | $19.11 | $51.51 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANMO20260069 | Residential | $32.40 | $19.11 | $51.51 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANS (STONE AND TANEY COUNTIES)MO20260001 | Heavy+Highway | $28.65 | $18.34 | $46.99 | 2026-08-27 | Doc → |
| Statewide | ELECTRICIAN, INCLUDING LOW VOLTAGE WIRING FOR AND INSTALLATION OF ALARMS: STONE AND TANEY COUNTIES (DOUGLAS, HICKORY, LACLEDE, OZARK, STONE, & TANEY COUNTIES)MO20260032 | Building | $28.65 | $18.34 | $46.99 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANS: CABLE SPLICERS (AUDRAIN (EXCEPT CUIVRE TOWNSHIP), BOONE, CALLAWAY, CAMDEN, CHARITON, COLE, CRAWFORD, DENT, GASCONADE, HOWARD, MARIES, MILLER, MONITEAU, OSAGE, PHELPS AND RANDOLPH COUNTIEMO20260001 | Heavy+Highway | $30.42 | $16.09 | $46.51 | 2026-08-27 | Doc → |
| Statewide | ELECTRICIANS: CABLE SPLICERS (BARRY, BARTON, CEDAR, DADE, JASPER, LAWRENCE, MCDONALD, NEWTON, ST CLAIR, AND VERNON COUNTIES)MO20260001 | Heavy+Highway | $25.40 | $12.19 | $37.59 | 2026-08-27 | Doc → |
| Camden | ELECTRICIANMO20260005 | Building | $25.82 | $8.24 | $34.06 | 2026-05-18 | Doc → |
| Cedar | ELECTRICIANMO20260008 | Building | $20.72 | $8.93 | $29.65 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIAN (CRAWFORD COUNTY)MO20260070 | Residential | $18.23 | $9.91 | $28.14 | 2026-05-18 | Doc → |
| Statewide | ELECTRICIANMO20260067 | Residential | $18.23 | $9.91 | $28.14 | 2026-05-18 | Doc → |
Wage determinations — MO
| Determination | Coverage | Electrician total | Effective | Source |
|---|---|---|---|---|
| MO20260080Building | St Louis City | $82.93 | 2026-09-03 | Document → |
| MO20260001Heavy, Highway | 115 counties | $37.59–$105.02 | 2026-08-27 | Document → |
| MO20260031Building | 24 counties | $59.74–$81.86 | 2026-05-18 | Document → |
| MO20260060Residential | 22 counties | $15.53 | 2026-05-18 | Document → |
| MO20260023Building | Shannon Co. (29203) | $51.51 | 2026-05-18 | Document → |
| MO20260085Building | Callaway, Cole, Osage | $63.76 | 2026-05-18 | Document → |
| MO20260030Building | 10 counties | $51.51–$82.93 | 2026-05-18 | Document → |
| MO20260070Residential | 7 counties | $28.14–$55.89 | 2026-05-18 | Document → |
| MO20260020Building | Ralls Co. (29173) | $59.74 | 2026-05-18 | Document → |
| MO20260058Residential | 30 counties | $15.53 | 2026-05-18 | Document → |
| MO20260056Building | Crawford Co. (29055) | $63.76 | 2026-05-18 | Document → |
| MO20260087Building | Lincoln, St Charles, Warren | $82.93–$82.93 | 2026-05-18 | Document → |
| MO20260012Building | Johnson Co. (29101) | $77.26 | 2026-05-18 | Document → |
| MO20260010Building | Cooper Co. (29053) | $81.86 | 2026-05-18 | Document → |
| MO20260011Building | Dunklin Co. (29069) | $82.93 | 2026-05-18 | Document → |
| MO20260014Building | Mississippi Co. (29133) | $82.93 | 2026-05-18 | Document → |
| MO20260015Building | New Madrid Co. (29143) | $82.93 | 2026-05-18 | Document → |
| MO20260013Building | Lawrence Co. (29109) | $53.06 | 2026-05-18 | Document → |
| MO20260057Residential | Pettis Co. (29159) | $16.00 | 2026-05-18 | Document → |
| MO20260088Building | McDonald, Newton | $53.06 | 2026-05-18 | Document → |
| MO20260016Building | Pemiscot Co. (29155) | $82.93 | 2026-05-18 | Document → |
| MO20260018Building | Phelps Co. (29161) | $63.76 | 2026-05-18 | Document → |
| MO20260017Building | Pettis Co. (29159) | $77.26 | 2026-05-18 | Document → |
| MO20260019Building | Pulaski Co. (29169) | $59.54 | 2026-05-18 | Document → |
| MO20260002Building | Audrain Co. (29007) | $59.74–$63.76 | 2026-05-18 | Document → |
| MO20260021Building | Ripley Co. (29181) | $82.93 | 2026-05-18 | Document → |
| MO20260025Building | Texas Co. (29215) | $59.54 | 2026-05-18 | Document → |
| MO20260022Building | Scott Co. (29201) | $82.93 | 2026-05-18 | Document → |
| MO20260024Building | Stoddard Co. (29207) | $82.93 | 2026-05-18 | Document → |
| MO20260027Building | Wright Co. (29229) | $51.51 | 2026-05-18 | Document → |
| MO20260028Building | Adair, Atchison | $59.74–$64.70 | 2026-05-18 | Document → |
| MO20260026Building | Vernon Co. (29217) | $53.06 | 2026-05-18 | Document → |
| MO20260029Building | Barry, Barton, Benton | $53.06–$77.26 | 2026-05-18 | Document → |
| MO20260084Building | Howard, Boone | $63.76 | 2026-05-18 | Document → |
| MO20260032Building | 9 counties | $46.99–$77.26 | 2026-05-18 | Document → |
| MO20260033Building | 6 counties | $59.74–$81.86 | 2026-05-18 | Document → |
| MO20260004Building | Butler Co. (29023) | $82.93 | 2026-05-18 | Document → |
| MO20260059Residential | 17 counties | $15.53 | 2026-05-18 | Document → |
| MO20260005Building | Camden Co. (29029) | $34.06 | 2026-05-18 | Document → |
| MO20260062Residential | Franklin Co. (29071) | $55.89 | 2026-05-18 | Document → |
| MO20260065Residential | Andrew, Buchanan, De Kalb | No electrician classes | 2026-05-18 | Document → |
| MO20260061Residential | 10 counties | $15.53 | 2026-05-18 | Document → |
| MO20260063Residential | Jackson Co. (29095) | $65.92 | 2026-05-18 | Document → |
| MO20260067Residential | Howard, Boone | $28.14 | 2026-05-18 | Document → |
| MO20260064Residential | St Louis City | $55.89 | 2026-05-18 | Document → |
| MO20260066Residential | 8 counties | $73.26 | 2026-05-18 | Document → |
| MO20260069Residential | 5 counties | $51.51 | 2026-05-18 | Document → |
| MO20260068Residential | 4 counties | $28.14 | 2026-05-18 | Document → |
| MO20260071Residential | Jasper, McDonald, Newton | $53.06 | 2026-05-18 | Document → |
| MO20260007Building | Carroll Co. (29033) | $81.86 | 2026-05-18 | Document → |
| MO20260072Building | Cass Co. (29037) | $81.86 | 2026-05-18 | Document → |
| MO20260073Building | Clinton Co. (29049) | $73.58–$81.86 | 2026-05-18 | Document → |
| MO20260074Building | Franklin Co. (29071) | $82.93–$82.93 | 2026-05-18 | Document → |
| MO20260076Building | Jasper Co. (29097) | $53.06 | 2026-05-18 | Document → |
| MO20260075Building | Greene Co. (29077) | $53.06 | 2026-05-18 | Document → |
| MO20260077Building | Jefferson Co. (29099) | $82.93–$82.93 | 2026-05-18 | Document → |
| MO20260079Building | Platte Co. (29165) | $73.58–$81.86 | 2026-05-18 | Document → |
| MO20260078Building | Moniteau Co. (29135) | $63.76 | 2026-05-18 | Document → |
| MO20260081Building | Andrew, Buchanan, De Kalb | $64.70 | 2026-05-18 | Document → |
| MO20260008Building | Cedar Co. (29039) | $29.65–$53.06 | 2026-05-18 | Document → |
| MO20260089Building | St Louis, Washington | $82.93–$82.93 | 2026-05-18 | Document → |
| MO20260086Building | 4 counties | $53.06 | 2026-05-18 | Document → |
| MO20260082Building | 6 counties | $73.58–$81.86 | 2026-05-18 | Document → |
| MO20260083Building | Bollinger, Cape Girardeau | $82.93 | 2026-05-18 | Document → |
| MO20260009Building | Chariton Co. (29041) | $63.76 | 2026-05-18 | Document → |
How prevailing wage works in Missouri
Electricians on federally funded construction in Missouri must be paid at least the Davis-Bacon prevailing wage for their classification and county. The U.S. Department of Labor publishes these rates as general wage determinations on SAM.gov, and federal contracting agencies incorporate the applicable determination into each covered contract. This page tracks 65 determinations covering Missouri.
Some states layer their own prevailing-wage schedules over the federal floor for state-funded work. ElectricianDB has not yet ingested a Missouri state schedule — until then, confirm state-funded requirements directly with the Missouri labor agency before bidding.
Use the determination table below as your starting point: match your project's county and construction type, then open the source document to confirm the classification definitions, footnotes, and any-Series modifications. Published rates are minimums — union agreements and tight labor markets routinely clear them — and misclassification (billing journeyman hours at a laborer rate) is one of the most common prevailing-wage violations.
Display note: we exclude rates below $12/hr base from this page. These are typically rural residential determinations at or near federal minimum wage, data-entry artifacts, or structurally non-journeyman classifications that misrepresent prevailing wage for commercial electrical work. The full dataset remains available via SAM.gov directly.
Sources
Related guides
Missouri license reciprocity
Licensed in Missouri? See which states honor it.
Electrician pay in Missouri
Market rates from live postings vs BLS vs IBEW scale.
Missouri data center builds
Federal projects pay these rates — see where they are.
IBEW locals in Missouri
Union halls, apprenticeship programs, and scales.
Data center electrician jobs guide
How to land prevailing-wage work on hyperscale builds.
Certifications that raise pay
NICET, NABCEP, OSHA-30 and more — what they cost and return.
Missouri prevailing wage FAQs
What is the prevailing wage for electricians in Missouri?
Across the 106 electrician rates currently tracked, totals (base + fringe) range from $15.53 to $105.02 per hour, with a median of $63.76. Your project's county and construction type determine which row applies.
How is the electrician prevailing wage set in Missouri?
Federal Davis-Bacon rates come from Department of Labor surveys of locally prevailing union and open-shop packages, published as SAM.gov wage determinations per county group and construction type.
Do apprentice electricians earn the full journeyman rate?
Registered apprentices in approved programs are typically paid a progression percentage of the journeyman base rate, while fringe treatment varies by determination and program. Unregistered workers generally must receive the full journeyman package. Confirm the apprentice terms in the determination footnotes and your program agreement.
Why are rates below $12/hr excluded?
We exclude rates below $12/hr base from display. These are typically rural residential determinations at or near federal minimum wage, data-entry artifacts, or structurally non-journeyman classifications that misrepresent prevailing wage for commercial electrical work. The full dataset remains available via SAM.gov directly, and our database retains every ingested row for audit.
Where can I verify the official Missouri rates?
Start with the source-document links in the determination table — federal rows link to SAM.gov, state rows to the publishing agency. For binding answers on coverage, classification, and conformance, contact the DOL Wage and Hour Division or the state labor agency.